a. Understanding the design requirement
b. Manufacturing process freezing
c. Taking trials on the cutting tools.
d. Introducing cost effective consumables
e. Supporting manufacturing team during FAI
2. Process Documents and Route card creation
a. Preparation of process document
b. Preparation of Route Card
c. Correction of Process Documents
d. Correction of Route Card
a. M-BOM creation in Oracle based on E-BOM
b. Modification of M-BOM after FAI prove out.
a. Process optimization after the FAI
b. Process optimization by introducing new Material
c. Process optimization by adapting effective ways of manufacturing