Tecnimont and Tecnimont Arabia Limited have been awarded two lump-sum turn-key EPC contracts related to a petrochemical expansion at the SATORP Refinery (a JV composed of Saudi Aramco and Total Energies), in Jubail, Kingdom of Saudi Arabia.
The overall value of the contracts is approximately USD 2 billion. The contracts relate to the execution of two packages of the complex, namely the “Derivatives Units” package - which includes a butadiene extraction unit, an olefin extraction unit, a methyl tert-butyl ether unit, a butadiene selective hydrogenation unit, a 2nd stage pygas hydrogenation unit and benzene & toluene extraction unit - and the “High Density Polyethylene (HDPE) & Logistic Area” package, which includes two polyethylene units and the relevant product logistic facilities.
The project’s scope of work entails complete engineering services, equipment and material supply, construction activities, pre-commissioning, and commissioning, and shall have a duration of approximately 4 years.
He/she directs subcontractor activities for his own discipline, ensuring that plant construction works are performed according to the erection schedules and project documents, within the assigned cost budget, and according to quality & safety procedures, as well as according to the terms and conditions of the subcontract.