.
Study the drawing, communicate & collect surveyor report and verify the SOQ and raise service PR.
Documentations of quality records. Preparing requirement of enabling materials and Schedule of Quantity in order to prepare P.O. / W.O. Inputs for RFP
Study plant layout, construction sequence, strategy, basic scope of work, base line schedule and project duration in association with AM,CM, PM
Prepare detail MTO for Fire Proofing from Egg MTO, Structural Drawing.
Prepare the SOQ and raise PR in coordination with material coordinator. Setting up of infrastructural facilities by the contractors and resource mobilization in correct sequence and in correct number.
Coordinate with EPC coordinator, commodity manager, Central civil group and material controller to ensure the availability of materials in time. Ensure day to day execution; study of Project standards, specifications, drawings and preparing correct construction sequence.
Ensure proper fabrication for excavation work and contractors erect proper scaffolding, staging, handrails, ladder fixing in case of work at height. Ensure RA sheets are filled up and signed off.
Ensure contractors conduct Tool box talk covering the execution procedures, safe use of tools & tackles and use of PPE's
.