- PENAL OPERATION OF SLITTING
- SIZE CHANGE WORK ON SLITTING
- COIL IDENTIFICATION AND FILL COIL SLITTING REPORT
- TO FOLLOW DEFINED GUIDELINES/ SOPS FOR SAFE WORK OPERATION
- TO USE/ CONSUME UTILITIES WITH RESPECT (NO WASTAGE)
- TO STOP THE SLITTING OPERATION IF ANY NON CONFORMITY ON PLATE AND COIL.
- CHANGE SLITTING CUTTER IF REQUIRED.
- SET MACHINE AND CUT THE COILS ACCORDING TO REQUIRED NORMS
- CHECK THE WIDTH, GRADE, COIL NO. AND COIL THICKNESS OF THE COIL BEFORE SLITTING AS PER SLITTING PLAN
- NO MISTAKE IN TRACEABILITY OF THE SLIT COILS AND PLATES
- LOADING OF PROPER COILS FOR SLITTING
- CHECK THE QUALITY OF THE SLITTING AFTER RECOILER
- MAINTAIN SAFETY AND HOUSEKEEPING IN SLITTING AREA
- MAINTAIN SPARES OF SLITTING CUTTERS AND SEPARATOR SPACERS
- TO ACHIEVE ZERO ACCIDENT IN SLITTING M/C OPERATION
- TO ACHIEVE ZERO TOLERANCE OF ENVIRONMENTAL DEVIATION INCLUDING COMPLIANCE
5 TO 10 YEARS EXPERIENCE IN PRODUCTION DEPARTMENT IN PIPE SHOLUD BE CONVERSANT WITH SAFETY, HOUSE KEEPING & ISO 9001 & API Q1 AWARENESS.