- HV & MV Single Line Diagram
- Overall Substation Equipment Layout Plan
- Equipment Layout Plan & Section – 220/132kV GIS Building
- Equipment Layout Plan & Section – 33/11kV GIS Building
- Equipment Layout Plan & Section – Transformer Area
- Equipment Layout Plan & Section – Bus & Line Reactor Area
- Equipment Layout Plan & Section – Gantry Area
- Cable Raceway Layout Plan & Section – 220/132kV GIS Building
- Cable Raceway Layout Plan & Section – 33/11kV GIS Building
- Cable Raceway Layout Plan & Section – Transformer Area
- Cable Raceway Layout Plan & Section – Bus & Line Reactor Area
- Cable Raceway Layout Plan & Section – Gantry Area
- Power System Analysis on short circuit, load flow, harmonics, and motor starting.
- HV & MV cable ampacity and heat dissipation sizing calculation.
- Insulation Coordination calculation
- Other drawings and documents as required by SEC
At Surbana Jurong, we put talent, hard work, teamwork and a fun workplace together to approach problems and solve them creatively and collaboratively. Join us in making a positive impact on the world!