1. Pre-Loading Preparation
- De-burr Part: Clean the raw stock or pre-machined part to remove sharp edges.
- Clean Vise/Fixture: Use an air gun to blow away chips from the jaw surfaces.
- Verify Stock: Check raw material dimensions before placing it inside. [1]
2. Loading & Machine Cycle
- Seat the Material: Place the workpiece firmly against the fixture locators.
- Secure Clamping: Tighten the vise or activate pneumatic clamps securely.
- Check Seating: Use a feeler gauge to ensure no gap exists underneath the part.
- Run Cycle: Close safety doors and press Cycle Start.
3. Unloading & Cleaning
- Wait for Stop: Open doors only after the spindle stops completely.
- Air Wash: Blow coolant and metal chips off the finished part while clamped.
- Unclamp: Release the part carefully to avoid dropping and denting it.
- Final Wipe: Clean the component thoroughly with a cloth before measuring.
4. Quality Inspection
- Visual Check: Inspect for visible defects like burrs, scratches, or chatter marks.
- Critical Dimensions: Measure key tolerances using micrometers or Vernier calipers.
- Thread Verification: Use go/no-go plug or ring gauges to check threads.
- Log Results: Record the dimensions on the shift quality sheet. [1]
Benefits:
- Food provided
- Provident Fund
Work Location: In person