Operation,Trouble shooting , Preventive & shutdown maintenance of section Equipments.Reduce the breakdowns and improve the section Equipment availability through PM checks.Maintain inventory for critical equipments & maintenance. Utilization of available resources to fulfil the plant requirement.Improve productivity by managing/minimum maintenance cost and resources .Ensures a safe, secure work environment in section by implementing the safety standards requirements in section.
Job Context:
UltraTech Cement Limited is the cement flagship company of the Aditya Birla Group. A USD 7.9 billion building solutions powerhouse, UltraTech is the largest manufacturer of grey cement, ready mix concrete (RMC) and white cement in India. It is the third largest cement producer in the world, excluding China. UltraTech is the only cement company globally (outside of China) to have 100+ MTPA of cement manufacturing capacity in a single country. The Company's business operations span UAE, Bahrain, Sri Lanka and India.
UltraTech has a consolidated capacity of 138.39 Million Tonnes Per Annum (MTPA) of grey cement. UltraTech has 23 integrated manufacturing units, 29 grinding units, one Clinkerisation unit and 8 Bulk Packaging Terminals. UltraTech has a dealer network of over 30,000 and retailer network of over 84,000 across the country, with a market reach of more than 80% Indian cities and towns. In the white cement segment, UltraTech goes to market under the brand name of Birla White. It has one White Cement unit and three Wall Care putty unit, with a current capacity of 1.98 MTPA. With 230+ Ready Mix Concrete(RMC) plants in 100+ cities, UltraTech is the largest manufacturer of concrete in India. It also has a slew of speciality concretes that meet specific needs of discerning customers. Our Building Products business is an innovation hub that offers an array of scientifically engineered products to cater to new-age constructions.
Narmada Cement - Jafarabad Works was established in 1982 as Narmada Cement Company Limited and merged with UltraTech in 2006. The installed capacity of 1 MMTPA clinker has been gradually increased to 1.50 MTPA (4,300 – 4,500 TPD). Cement capacity is 0.50 MTPA (1,150 TPD).
It is India’s first split location dry process cement plant with Fuller technology having four-stage suspension pre-heater, in-line flash calciner, reverse air bag house dust collector, vertical roller mills besides to be the first to unload imported South African coal at plant jetty. It transports 100% clinker to grinding units is in bulk by sea route. The special feature of this plant is ‘Just in Time’ design for raw mill circuit. As against conventional norms of 20,000 MT silo for raw meal storage it has 2,000 MT silo.
The grinding units associated with Jafrabad Cement Works are Magdalla Cement Works and Ratnagiri Cement Works. All three coast-based split location clinker manufacturing units have jetties. Narmada Cement was the prime supplier of fly ash-based Portland Pozzolana Cement (PPC) to Sardar Sarovar Dam on river Narmada, which is the World’s second largest concrete gravity dam (by volume).
Narmada Cement Mine is the captive mine for Jafarabad plant having a production capacity of 2.30 MTPA. It is situated near coastal village of Babarkot, 7 km from Jafarabad port. Out of the total 565.94 hector lease area.
KRA (Accountabilities) (Max 1325 Characters)
Supporting Actions (Max 1325 Characters)
KRA1
Accountability
1. Supervise & coordinate electrical maintenance activities to maximize the Section Equipment availability. Scheduling of Weekly maintenance & shutdown jobs. Workout to fulfil the material & manpower requirement.
2. Troubleshooting and corrective action of Electrical breakdown or failures to find the root cause and best solution in order to restore the functionality back to normal within least possible time.
3. Daily Energy monitoring of section Equipment.
4. Complience to all PM checklist, Preventive maintenance of Equipment.
5. Ensuring Safe work Enviroment by implementing all Safety standard.
6. Identification /Implementation of energy saving projects.
KRA2
System Implementation
1.Organize & Implement the safety standards and WCM systems through the involvement of people for plant improvement and productivity. Identify abnormalities, unsafe conditions and execute improvement jobs.
KRA3
Modification / Upgradation
Identify the abnormalities & unsafe conditions at site and doing modifications / upgradations on continuous basis to improve plant performance.
KRA4
Safety & statutory compliance
1.Carryout the required checking, testing as per guidelines. Take corrective measures for deviations. Identify & rectify unsafe points & unsafe practice in the area.
2. Ensuring implementation of adequate safety measures to ensure accident free operations of the plants.