- Check the quality of all materials received on site.
- Check the stacking and storage of materials in various godowns and stores of the site systematically.
-
Check the wastage of material at the site.
- Checking of work and reporting it to the Project Engineer.
- Before the commencement of a new activity, the Quality Control Engineer should issue N.O. C. to ensure preliminary preparations of the different stages of the work-related activities as per format.
- Layout
-
Strata
-
R.C.C
-
Masonry
-
Plastering
-
Painting
-
Waterproofing
-
Plumbing
-
Development
-
Checking safety measures
-
Observation of defects in materials received on site.
-
Check buildings that are complete and ready for possession.
-
Find solutions to practical problems faced during the execution of work, for maintaining optimum quality.
-
Collect various suggestions from site engineers, analyze them and decide on the best alternative solutions, and set up new quality control methods after discussion with the Directors.
-
Implementation of advanced construction techniques.
This job is located in Gachibowli, Hyderabad.